Erkenek HEPP (2x6 MW)
Gölbaşı, Adıyaman / Turkey
Power House and Penstocks Line
Regulator Structure and Lake Area
Turbine-Generator Group
CLIENT: TEKTUĞ ELEKTRİK ÜRETİM A.Ş.
PROJECT: ERKENEK HEPP (2x6 MW), GÖLBASI, ADIYAMAN / TURKEY
CONTRACTOR: Çiltuğ A.Ş.
SCOPE:
- Complete civil works, mechanical and electrical equipment fabrication and erection works.
- Civil works for regulator structure, transmission line, water charge pool and power house building.
- Fabrication and erection of all hydro-mechanical equipment.
- Complete civil works for regular structures, water transmission line, head pond and power house.
- Complete fabrication and erection of hydro mechanical equipment and penstock lines, power house crane.
- Complete erection of spiral cases, butterfly valves, turbine and generator groups.
- Complete installation of switch yard and energy transmission line.
TOTAL WEIGHT: 900 Tons
COMPLETED IN: 2009