CLIENT: Çukurova Electricity Inc. (ÇEAS)
PROJECT: SIR DAM AND HEPP PROJECT (3x94,6 MW) KAHRAMANMARAŞ / TURKEY
CONTRACTOR: Toshiba Co. / Japan
SUB-CONTRACTOR: Çiltuğ A.Ş.
SCOPE: Erection of spiral cases, draft tubes, turbines, generators and accessories. 96 MW Francis turbine, 105 MWA generator, Ø7.4 m spiral casing, Ø5.3 m inlet pipe, Ø3.55 m draft tube, Ø3.14 m lenght 20.6 m draft tube outlet pipe, draft tube gates in dimension of 10.4 mx12 m, central power crane with 240 ton capacity and governor systems.
COMPLETED IN: 1991