Andırın HEPP Project (42 MW)

Kahramanmaraş / Turkey

CLIENT: Tektuğ Elektrik Üretim A.Ş.

PROJECT: ANDIRIN HEPP (42 MW) PROJECT, ANDIRIN-KAHRAMANMARAS / TURKEY

CONTRACTOR: Çiltuğ A.Ş.

SCOPE:

  • Complete civil works and mechanical and electrical equipment fabrication and erection works.
  • Civil works for regulator structure, transmission line, water charge pool and power house building
  • Fabrication and erection of all hydro-mechanical equipment.
  • Complete civil works for regular structures,  water transmission line, head pond and power house.
  • Complete fabrication and erection of hydro mechanical equipment and penstock lines, power house crane.
  • Complete erection of spiral cases, butterfly valves, turbine and generator groups.
  • Complete installation of switch yard and energy transmission line.

TOTAL EQUIPMENT WEIGHT: 2,044 Tons

COMPLETED IN: 2010