Batman Dam & HEPP (3x63 MW)
Diyarbakır / Turkey
Trifurcation Branch Pipe (During Erection)
Tunnel Steel Lining (During Erection)
Penstock Fabrication at site and prefabrication Area. Total= 35 tons.
Trifurcation Branch Pipe, Ø inlet= 9500 mm / Ø outlet= 5000 mm x 3 / Weight= 700 ton
CLIENT: General Directorate of State Hydraulic Works of Turkey (DSİ)
PROJECT: BATMAN DAM AND HEPP (3x63 MW), SILVAN-DIYARBAKIR / TURKEY
CONTRACTOR: Onar-Günsayıl İnş. / Turkey
SUB-CONTRACTOR: Çiltuğ A.Ş.
SCOPE:
- Fabrication and erection of all hydro- mechanical equipment, Intake Gates, Trashracks, Penstocks, Tri-Furcation and bifurcation branch pipes, gantry cranes, slide and conical valves. Steel Lining and Penstocks: 3,500 tons
- Radial gates: 6 no’s, 1,600 tons
- Trashracks, stoplogs service gates and other equipment: 1,900 tons.
TOTAL WEIGHT: 7,000 Tons
COMPLETED IN: 2000