Atatürk Dam and HEPP (8×300 MW) EMPLOYER: General Directorate of State Hydraulic Works (DSI) SCOPE OF WORK: Production, sand blasting, painting, installation and testing of forced pipes, fixed and sliding bearings, expansion seals. Pipe Diameter: Ø5.5m to Ø8 m Pipe Sheet Thicknesses: 22-44 mm Dec.20 Dec.201-201-201-201-201-201-201…
Kalen I-II HEPP Project
Ø1800 / Ø1900 mm ve Ø1300 / Ø800 mm penstock and elbow, branch, hydro-mechanical equipment fabrication and erection.
Artvin HEPP Project (2x166 MW)
Artvin HEPP Project (2×166 MW) EMPLOYER: Alstom Power Transportation A.Sh. / Turkey SCOPE OF BUSINESS: Lower outlet and inlet grids, inlet transmission, lower outlet forced pipe, lower outlet sliding valves, lower outlet gate valves and valves, inlet valves and embedded parts, dipsavak…
Aksu HEPP Project
Aksu HEPP Project EMPLOYER: Kalen Enerji Elektrik Üretim A.Sh. / Turkey SCOPE OF BUSINESS: Manufacture and installation of forced pipes, howel-bungen valves and steel coatings.
Boyabat HEPP Project (3x170 MW)
Boyabat Dam and HEPP (3×170 MW) EMPLOYER: Doğuş Inşaat ve Tic. A.Sh. SCOPE OF WORK: Hydromechanical equipment manufacturing and assembly works.
Keklicek HEPP Project
Keklicek HEPP Project EMPLOYER: H.G.M. Energy Construction Ltd. Şti̇. / Turkey SCOPE OF BUSINESS: Manufacture and installation of forced pipes and hydromechanical equipment.
Akköy 2 HES (2×116 MW, 2011)
Akköy 2 HEPP (2×116 MW, 2011) EMPLOYER: Kolin Construction Tourism Industry and Trade. A.Sh. SCOPE OF WORK: Forced pipe manufacturing and installation works.
Batman Dam & HEPP (3x63 MW)
Batman Dam and HEPP (3×63 MW) EMPLOYER: General Directorate of State Hydraulic Works (DSI) SCOPE OF WORK: Manufacture and installation of all permanent hydro-mechanical equipment, covers, grilles, forced pipes, branch pipes, cranes, sliding and tapered valves. Ø9.5 m / 3X5 m triple branch, Ø5…