Information of the project
Sır Dam & HEPP Project (3x94,6 MW)
CLIENT:
Çukurova Electricity Inc. (ÇEAS)
SCOPE:
- Erection of spiral cases, draft tubes, turbines, generators and accessories. 96 MW Francis turbine, 105 MWA generator, Ø7.4 m spiral casing, Ø5.3 m inlet pipe, Ø3.55 m draft tube, Ø3.14 m lenght 20.6 m draft tube outlet pipe, draft tube gates in dimension of 10.4 mx12 m, central power crane with 240 ton capacity and governor systems.
Technical description
Sır Barajı ve HES (3x94,6 MW)