Information of the project
Batman Dam & HEPP (3x63 MW)
CLIENT:
General Directorate of State Hydraulic Works of Turkey (DSİ)
SCOPE:
- Fabrication and erection of all hydro- mechanical equipment, Intake Gates, Trashracks, Penstocks, Tri-Furcation and bifurcation branch pipes, gantry cranes, slide and conical valves.
- Ø9,5 m / 3xØ5 m triple branch,
- Ø5 m/Ø4.5m/Ø2.6m double branch,
- Ø2,6m / Ø2 m / Ø1,5m Branches,
- Steel Lining and Penstocks: 3,500 tons
- Radial gates: 6 no’s, 1,600 tons
- Trashracks, stoplogs service gates and other equipment: 1,900 tons.
Technical description
Batman Dam & HEPP (3x63 MW)





