Ova HES Projesi (3×4.5 MW) İŞVEREN: GLOBAL Hydro Enerji Hizmetleri A.Ş. İŞ KAPSAMI: Kaplan Turbine Stationary Accessories Wicket Gate Ring:Ø4880/3354 – ağırlık:9,716kg/set Bearing Housing: Ø2177 – ağırlık:2,620kg/set Discharge Ring:Ø3930 h:1093mm – ağırlık: 7,185kg/set D.T Cone: Ø3730/3526 – ağırlık:7,095kg/set
Ceyhan HEPP Project (6x10 MW)
Ceyhan HEPP Project (6×10 MW) EMPLOYER: Alstom Power / Austria SCOPE OF WORK: Production of 6 suction pipes, 6 embedded steel structures and 2 sets of counterweights.
Akköy HES Projesi (3×34,5 MW)
Akköy HEPP Project (3×34.5 MW) EMPLOYER: Voith Siemens Hydroelectric Power Generation / Australia SCOPE OF BUSINESS: Production of 3 snails, stay rings and assembly materials and delivery to the Akköy site.
Kuşluk II HEPP Project
Kuşluk 2 HEPP Project EMPLOYER: Andritz Hydro Ltd.Şti̇., Ankara / Turkey SCOPE OF BUSINESS: Production of 2 unit distribution pipes, inlet ports, turbine housings and parts.
Boyabat HEPP Project (3x170 MW)
Boyabat Dam and HEPP (3×170 MW) EMPLOYER: Doğuş Inşaat ve Tic. A.Sh. SCOPE OF WORK: Hydromechanical equipment manufacturing and assembly works.
Akköy HEPP Suction Pipe
Akköy HEPP Suction Pipe EMPLOYER: Voith Siemens Hydro Power Generation SCOPE OF BUSINESS: Production of 3 suction pipe brackets and installation materials and delivery to the Akköy site. (Ø1780/5200×1220 mm)
Keklicek HEPP Project
Keklicek HEPP Project EMPLOYER: H.G.M. Energy Construction Ltd. Şti̇. / Turkey SCOPE OF BUSINESS: Manufacture and installation of forced pipes and hydromechanical equipment.
Borçka-Muratlı HEPP Project
Borcka-Muratlı HEPP Project EMPLOYER: Voith Siemens Hydro Power Generation SCOPE OF BUSINESS: 2 pcs Øi=5.630 / Ø4.991 mm suction pipe manufacturing and supply.Jul.
Akköy 2 HES (2×116 MW, 2011)
Akköy 2 HEPP (2×116 MW, 2011) EMPLOYER: Kolin Construction Tourism Industry and Trade. A.Sh. SCOPE OF WORK: Forced pipe manufacturing and installation works.
Batman Dam & HEPP (3x63 MW)
Batman Dam and HEPP (3×63 MW) EMPLOYER: General Directorate of State Hydraulic Works (DSI) SCOPE OF WORK: Manufacture and installation of all permanent hydro-mechanical equipment, covers, grilles, forced pipes, branch pipes, cranes, sliding and tapered valves. Ø9.5 m / 3X5 m triple branch, Ø5…