Cağlayan HEPP Project (10 MW)
Adıyaman / Turkey
CLIENT: Tektuğ Elektrik Üretim A.Ş.
PROJECT: Çağlayan HEPP (10 MW) PROJECT, ADIYAMAN / TURKEY
CONTRACTOR: Çiltuğ A.Ş.
SCOPE:
- Complete civil works and mechanical and electrical equipment fabrication and erection works.
- Civil works for regulator structure, transmission line, water charge pool and power house building
- Fabrication and erection of all hydro-mechanical equipment.
- Complete civil works for regular structures, water transmission line, head pond and power house.
- Complete fabrication and erection of hydro mechanical equipment and penstock lines, power house crane.
- Complete erection of spiral cases, butterfly valves, turbine and generator groups.
- Complete installation of switch yard and energy transmission line.
TOTAL EQUIPMENT WEIGHT: 1,000 Tons
COMPLETED IN: 2017