Kalealti-II HEPP (12 MW)

Kadirli, Osmaniye / Turkey

CLIENT: TEKTUĞ ELEKTRİK ÜRETİM A.Ş. (Under the control of the Ministry of Energy and Energy Market Regulatory Authority)

PROJECT: KALEALTI-II HEPP (12 MW), KADİRLİ, OSMANİYE / TURKEY

CONTRACTOR: Çiltuğ A.Ş.

SCOPE:

  • Complete civil works, mechanical and electrical equipment fabrication and erection works.
  • Complete civil works for regulator structure,  water transmission canal and tunnel, head pond and power house. 
  • Complete fabrication and erection of hydro-mechanical equipment and penstock lines, power house crane.
  • Complete erection of spiral cases, butterfly valves, turbine and generator groups.
  • Complete installation of switch yard and energy transmission line.

TOTAL WEIGHT: 585 Tons

COMPLETED IN: 2014