Kargılık HEPP (2x12 MW)
Kahramanmaraş / Turkey
Regulator Structure, Downstream View
Regulator Structure, Downstream View
Head Pond
Head Pond
Penstocks Line
Penstocks Line
Regulator Lake Area
Power House, Switch Yard
Power House, Generator Group
Power House, Generator Group
CLIENT: TEKTUĞ ELEKTRİK ÜRETİM A.S. (Under the control of the Ministry of Energy and Energy Market Regulatory Authority)
PROJECT: KARGILIK HEPP (2x12 MW), ANDIRIN - KAHRAMANMARAS / TURKEY
CONTRACTOR: Çiltuğ A.Ş.
SCOPE:
- Complete civil works and mechanical and electrical equipment fabrication and erection works.
- Civil works for regulator structure, transmission line, water charge pool and power house building
- Fabrication and erection of all hydro-mechanical equipment.
- Complete civil works for regular structures, water transmission line, head pond and power house.
- Complete fabrication and erection of hydro mechanical equipment and penstock lines, power house crane.
- Complete erection of spiral cases, butterfly valves, turbine and generator groups.
- Complete installation of switch yard and energy transmission line.
TOTAL EQUIPMENT WEIGHT: 1,000 Tons
COMPLETED IN: 2005