Nasiriyah Drainage Pump Station Project
Iraq
Inlet and Outlet Guard Gates
CLIENT: Washington International Black & Veatch Public Works J.V. / USA
PROJECT: NASIRIYAH DRAINAGE PUMP STATION PROJECTS / IRAQ
CONTRACTOR: Çiltuğ A.Ş.
SCOPE: Fabrication and exworks delivery for:
- 2 set of inlet guard gate upper panel (1600 x 6400 x 725 mm)
- 2 set of inlet guard gate lower panel (2400 x 6400 x 725 mm)
- 2 set of outlet guard gate panel (4765 x 5000 x 4985 mm)
TOTAL WEIGHT: 37 Tons
COMPLETED IN: 2007