Keban Deresi HEPP (5,5 MW)

Keban, Elazığ / Turkey

CLIENT: TEKTUĞ ELEKTRİK ÜRETİM A.Ş. (Under the control of the Ministry of Energy and Energy Market Regulatory Authority)

PROJECT: KEBAN DERESI HEPP (5,5 MW), KEBAN, ELAZIĞ / TURKEY

CONTRACTOR: Çiltuğ A.Ş.

SCOPE:

  • Complete civil works and mechanical and electrical equipment fabrication and erection works.
  • Complete civil works for regulator structures, water transmission tunnels (1.800 m), head pond and power house.
  • Complete fabrication and erection of hydro-mechanical equipment and penstock lines, power housecrane.
  • Complete erection of spiral cases, butterfly valves, turbine and generator groups. 
  • Complete installation of switch yard and energy transmission line.

TOTAL WEIGHT: 200 Tons

COMPLETED IN: 2007