Kalealtı II HEPP (13.795 MW)

2014 / Osmaniye, Turkey

  • CLIENT: Tektuğ Elektrik Üretim A.Ş. (Under the control of the Ministry of Energy and Energy Market Regulatory Authority)
  • PROJECT: Höçgören HEPP (13.795 MW) / Osmaniye, Turkey
  • CONTRACTOR:Çiltuğ Heat Industry and Trade Co. (Directly)
  • SCOPE: Complete civil works and mechanical and electrical equipment fabrication and erection works. Complete civil works for regulator structure, water transmission canal and tunnel, head pond and power house. Complete fabrication and erection of hydro-mechanical equipment and penstock lines, power house crane. Complete erection of spiral cases, butterfly valves, turbine and generator groups. Complete installation of switch yard and energy transmission line.
  • COMPLETED IN: March 2014