Projects

Boyabat DAM and HEPP (3x170 MW)

2011 / Sinop, Turkey

  • CLIENT: Doğuş İnşaat ve Tic. A.Ş.
  • PROJECT: Boyabat DAM and HEPP (3x170 MW), Sinop, Turkey
  • CONTRACTOR: Çiltuğ Heat Industry and Trade Co. (Directly)
  • SCOPE: Fabrication and erection of Hydromechanical Equipments.
  • TOTAL PROJECT WEIGHT: 5,000 Tons
  • COMPLETED IN: 2011

PRODUCT GROUPS