Projects

Akköy II HEPP Penstock Project

2011 / Giresun, Turkey

  • CLIENT: Kolin İnşaat Turizm Sanayi ve Tic. A.Ş.
  • PROJECT: Akköy II HEPP (2x116 MW), Giresun, Turkey
  • CONTRACTOR: Çiltuğ Heat Industry and Trade Co. (Directly)
  • SCOPE: Fabrication and erection of penstocks.
  • TOTAL PROJECT WEIGHT: 9,500 Tons
  • COMPLETED IN: 2011

PRODUCT GROUPS