Projects

Andırın HEPP Project (1x42 MW)

2009 / Andırın - Kahramanmaraş, Turkey

  • CLIENT: Tektuğ Elektrik Üretim A.Ş.
  • PROJECT: Andırın HEPP (1 x 42 MW) / Kahramanmaraş, Turkey
  • CONTRACTOR: Çiltuğ Heat Industry and Trade Co. (Directly)
  • SCOPE: Complete civil Works and mechanical and electrical equipment fabrication and erection works. Civil works for regulator structure, transmission line, water charge pool and power house building. Fabrication and erection of all hydro-mechanical equipment. Complete civil works for regular structures, water transmission line, head pond and power house. Complete fabrication and erection of hydro mechanical equipment and penstock lines, power house crane. Complete erection of spiral cases, butterfly valves, turbine and generator groups. Complete installation of switch yard and energy transmission line.
  • TOTAL EQUIPMENT WEIGHT: 2,044 Tons
  • COMPLETED IN: 2009

PRODUCT GROUPS