Kargilik HEPP Project (2 x 12MW)

2005 / Andırın - Kahramanmaraş, Turkey

  • CLIENT: Tektuğ Elektrik Üretim A.Ş. (Under the control of the Ministry of Energy and Energy Market Regulatory Authority)
  • PROJECT: Kargilik HEPP Project (2 x 12MW) / Andırın - Kahramanmaraş, Turkey
  • CONTRACTOR: Çiltuğ Heat Industry and Trade Co.
  • SCOPE:  Complete civil works and mechanical and electrical equipment fabrication and erection works. Civil works for regulator structure, transmission line, water charge pool and power house building. Fabrication and erection of all hydro-mechanical equipment. Complete civil works for regular structures, water transmission line, head pond and power house. Complete fabrication and erection of hydro mechanical equipment and penstock lines, power house crane. Complete erection of spiral cases, butterfly valves, turbine and generator groups. Complete installation of switch yard and energy transmission line.
  • TOTAL WEIGHT: 1.000 Tones.
  • COMPLETED IN: 2005